{"id":91281,"date":"2021-10-14T14:03:42","date_gmt":"2021-10-14T12:03:42","guid":{"rendered":"https:\/\/pecs.hu\/kozlekedesfejlesztes\/"},"modified":"2026-10-26T15:16:55","modified_gmt":"2026-10-26T14:16:55","slug":"kozlekedesfejlesztes","status":"publish","type":"post","link":"https:\/\/pecs.hu\/en\/kozlekedesfejlesztes\/","title":{"rendered":"Traffic development"},"content":{"rendered":"\n<p>The Municipality of P\u00e9cs regards the expansion and development of the city\u2019s transport options as a key priority. During the 2014\u20132020 funding period, the Municipality of P\u00e9cs won a number of tenders for the development of roads and cycle paths through the Regional Development Operational Programme (TOP) provided by Sz\u00e9chenyi 2020; these projects have enabled the improvement of connections between different parts of the city, as well as the renovation \u2013 and in some cases the construction \u2013 of road sections across the city that increase road capacity and stimulate the economy.<\/p>\n\n\n\n<p>In the spirit of climate change mitigation, the city also successfully applied for funding to renovate and develop cycle paths and associated facilities that encourage cycling and public transport, as well as to procure electric city buses.<\/p>\n\n\n<section id=\"carousel-gallery-block_f24d21ee05368be594625adba8d58966\"class=\"block block-carousel-gallery alignwide\" >\n  \n    <div class=\"carousel-gallery carousel CarouselGallery\">\n                        <div class=\"carousel-gallery__item carousel__item\">\n    <picture><source media=\"(max-width: 767px)\" srcset=\"https:\/\/pecs.hu\/app\/uploads\/2021\/10\/kerekpar-ut.jpg\"><img decoding=\"async\" src=\"https:\/\/pecs.hu\/app\/uploads\/2021\/10\/kerekpar-ut.jpg\" alt=\"Ker\u00e9kp\u00e1r \u00fat\" class=\"carousel-gallery__item carousel__item\"\/><\/picture>\n  <\/div>\n                              <div class=\"carousel-gallery__item carousel__item\">\n    <picture><source media=\"(max-width: 767px)\" srcset=\"https:\/\/pecs.hu\/app\/uploads\/2021\/10\/nevtelen-terv-14.jpg\"><img decoding=\"async\" src=\"https:\/\/pecs.hu\/app\/uploads\/2021\/10\/nevtelen-terv-14.jpg\" alt=\"N\u00e9vtelen Terv (14)\" class=\"carousel-gallery__item carousel__item\"\/><\/picture>\n  <\/div>\n                              <div class=\"carousel-gallery__item carousel__item\">\n    <picture><source media=\"(max-width: 767px)\" srcset=\"https:\/\/pecs.hu\/app\/uploads\/2021\/10\/felfestes.jpg\"><img decoding=\"async\" src=\"https:\/\/pecs.hu\/app\/uploads\/2021\/10\/felfestes.jpg\" alt=\"Felfest\u00e9s\" class=\"carousel-gallery__item carousel__item\"\/><\/picture>\n  <\/div>\n                              <div class=\"carousel-gallery__item carousel__item\">\n    <picture><source media=\"(max-width: 767px)\" srcset=\"https:\/\/pecs.hu\/app\/uploads\/2021\/10\/ebusz.jpg\"><img decoding=\"async\" src=\"https:\/\/pecs.hu\/app\/uploads\/2021\/10\/ebusz.jpg\" alt=\"Ebusz\" class=\"carousel-gallery__item carousel__item\"\/><\/picture>\n  <\/div>\n            <\/div>\n<\/section>\n\n\n\n<figure class=\"wp-block-table alignwide is-style-stripes\"><table><tbody><tr><td><strong>Code of project<\/strong><\/td><td><strong>Name of project<\/strong><\/td><td><strong>Status of project<\/strong><\/td><td><strong>Facilities affected by the development<\/strong><\/td><td><strong>Length of the route affected by the development<\/strong><\/td><\/tr><tr><td>TOP-6.1.5-15-PC1-2016-00002<\/td><td>Construction of an east-west road to boost the economy and open up industrial areas \u2013 Phase I: Development of Heged\u0171s J\u00e1nos Street<\/td><td>Completed in October 2018<\/td><td>A single-lane industrial access road with a footpath; improvements to street lighting and the rainwater drainage system; 1 bus stop; 1 pedestrian crossing;<\/td><td>70700 m of industrial access road and pavement<\/td><\/tr><tr><td>TOP-6.1.5-15-PC1-2016-00004<\/td><td>Construction of an east-west road to boost the economy and open up industrial areas \u2013 Phase III: Linking F\u00fczes d\u0171l\u0151 and Nyugati ipari \u00fat<\/td><td>Completed in December 2020<\/td><td>construction of a new industrial access road and cycle path; one cycle crossing with traffic lights on Main Road No. 57; new street lighting installed in the town centre; a covered stormwater drainage channel was built along the entire length of the cycle path;<\/td><td>640 m of new industrial access road; 1,260 m of cycle path<\/td><\/tr><tr><td>TOP-6.1.5-15-PC1-2020-00006<\/td><td>Transport development aimed at promoting economic growth and encouraging labour mobility. Development of Megyeri Road<\/td><td>planning<\/td><td>Upgrading the existing public road along Megyeri \u00fat; constructing and marking out cycle facilities along the route of Megyeri \u00fat and Verseny utca; and improving safety for cyclists and pedestrians.<\/td><td>Development of 300 m of industrial road; 2,100 m of new cycle path<\/td><\/tr><tr><td>TOP-6.4.1-15-PC1-2016-00001<\/td><td>Development of the E-bike system, Phase I<\/td><td>Completed in June 2019 <\/td><td>Procurement of 70 PEDELEC-powered electric bicycles; Establishment of 7 stations (Ifj\u00fas\u00e1g \u00fatja, Barbak\u00e1n t\u00e9r, Szepesy Ign\u00e1c utca, Kossuth t\u00e9r, B\u00faza t\u00e9r, 48-as t\u00e9r, Zsolnay Negyed); development of the necessary supporting infrastructure for charging and hire along the route of the Egyetemv\u00e1rosi cycle path;<\/td><td>Designation of a 1,200-metre cycling facility;<\/td><\/tr><tr><td>TOP-6.4.1-16-PC1-2017-00001<\/td><td>Zsolnay Quarter \u2013 Construction of the Budai V\u00e1m cycle path<\/td><td>Completed in July 2020<\/td><td>construction of a new cycle path between the Zsolnay Cultural Quarter and the Buda Customs House; improvement of street lighting along the cycle path; upgrading of junctions with traffic lights;<\/td><td>Construction or designation of a 2,000-metre cycling facility<\/td><\/tr><tr><td>TOP-6.4.1-15-PC1-2016-00003<\/td><td>Construction of the Kertv\u00e1ros\u2013Belv\u00e1ros cycle route<\/td><td>in preparation<\/td><td>Construction of cycling facilities between the Education Centre and the city centre, and ensuring cycling access to T\u00fcsk\u00e9sr\u00e9ti Lake; improving cycling safety at existing road junctions; upgrading the Aidinger\u2013Mal\u00e9ter junction;<\/td><td>Construction of a cycle facility over a length of 4,500 metres<\/td><\/tr><tr><td>TOP-6.4.1-15-PC1-2016-00004<\/td><td>Construction of a cycle path in the western part of the city<\/td><td>the marketing authorisation procedure is  underway<\/td><td>cycle facilities with correct way-finding west of the T\u00fcz\u00e9r utca junction on Szigeti \u00fat, R\u00e1cv\u00e1rosi \u00fat and Pell\u00e9rdi \u00fat, and in P\u00e9cs-Patacs on F\u0151, Kors\u00f3 and V\u00f6r\u00f6sk\u0151 utc\u00e1k; a signal-controlled cycle crossing at the Magyar\u00fcr\u00f6gi \u00fat junction; improvements to street lighting along the cycle path on Szigeti \u00fat;<\/td><td>4,000 metres of new cycling facilities<\/td><\/tr><tr><td>TOP-6.4.1-15-PC1-2016-00005<\/td><td>Implementation of the East-West public transport corridor<\/td><td>in preparation<\/td><td>road improvements on Szigeti \u00fat between T\u00fcz\u00e9r utca and Megyeri \u00fat; the design and construction of cycling facilities; and improvements to traffic light-controlled junctions on T\u00fcz\u00e9r utca and Honv\u00e9d utca<\/td><td>650 m of cycling infrastructure development; 650 m of public road development<\/td><\/tr><tr><td>TOP-6.4.1-15-PC1-2016-00006<\/td><td>Preparation of the Sustainable Urban Mobility Plan (SUMP) for the Municipality of P\u00e9cs<\/td><td>Completed in March 2019 <\/td><td>\u00a0markings for cycle facilities along the entire length of Munk\u00e1csy Mih\u00e1ly Street and on F\u00fcrd\u0151 Street<\/td><td>700-metre cycle route<\/td><\/tr><tr><td>TOP-6.4.1-16-PC1-2017-00002<\/td><td>Development of Nagy Imre Road<\/td><td>Completed in January 2021 <\/td><td>road improvements on Nagy Imre Road between the Mal\u00e9ter and Kesz\u00fci Road junctions; two bus stops were refurbished; improvements to the street lighting network; safe junction crossings were constructed; two smart zebra crossings were installed; construction of a 1,500-metre cycle path between Mal\u00e9ter P\u00e1l Road and the Expo Centre<\/td><td>550 m of road improvements; 1,500 m of cycle path built<\/td><\/tr><tr><td>TOP-6.4.1-16-PC1-2017-00003<\/td><td>Transport improvements along the north-south axis of the city centre<\/td><td>Completed in March 2021 <\/td><td>construction of a cycle facility north of the railway underpass on Sikl\u00f3si \u00fat, from the railings of the railway underpass to Kossuth Square; road safety improvements at the Ipar utca junction, and replacement of the worn asphalt surface at the Bajcsy-Zsilinszky \u2013 Ipar utca junction; upgrading of the street lighting network and replacement of the wearing course between Z\u00f3lyom Street and King Lajos Nagy Road; a new southern access route to the Centrum car park has been created for traffic approaching from the west, and a cycle route has been established at the junction of R\u00e1k\u00f3czi Road and King Lajos Nagy Road; on the eastern side, between Nagy Lajos kir\u00e1ly \u00fat and R\u00e1k\u00f3czi \u00fat, new cobbled paving was laid by widening the existing pavement, and a new taxi rank was built next to the Centrum car park; at the junction of Bajcsy-Zsilinszky Street and King Lajos Nagy Road, a new right-turn lane has been created for traffic travelling from the west to the east;<\/td><td>700 m of cycling infrastructure development; 300 m of public road development<\/td><\/tr><tr><td>TOP-6.3.2-15-PC1-2016-00007<\/td><td>The development of the Youth Centre and the Centrum car park<\/td><td>Completed in August 2021 <\/td><td>upgrading and expanding the existing car park to include 252 new standard parking spaces, paved with paving stones; 5 new accessible parking spaces; the creation of 5 loading bays; 4 electric vehicle charging points;<\/td><td>Construction and development of 252 standard parking spaces in the city centre of P\u00e9cs<\/td><\/tr><tr><td>TOP-6.3.2-15-PC1-2016-00001<\/td><td>Green space improvements in Ur\u00e1nv\u00e1ros along Main Road No. 6<\/td><td>Completed<\/td><td>construction of a new cycle path; refurbishment of an existing public road; improvement of on-street parking; resurfacing of an existing pavement<\/td><td>1,065 metres of new cycling facilities<\/td><\/tr><tr><td>TOP-6.1.3-15-PC1-2016-00002<\/td><td>Construction of a new market hall in P\u00e9cs<\/td><td>under construction<\/td><td>Construction of a car park with 47 spaces; construction of a roundabout on Ipar Street;<\/td><td>1 d1 new roundabout junction<\/td><\/tr><tr><td>IKOP-3.2.0-15-2017-00021<\/td><td>Development of public transport in the City of P\u00e9cs<\/td><td>Completed in March2021 <\/td><td>The procurement of 10 low-floor, exclusively electric-powered single-deck city buses, each with a passenger capacity of 64; charging infrastructure has been installed at the T\u00dcKE Busz Zrt. depot on T\u00fcsk\u00e9sr\u00e9ti \u00fat;<\/td><td>10 new electric buses<\/td><\/tr><tr><td>TOP-6.3.2-16-PC1-2017-00001<\/td><td>Green Gate \u2013 Franciscans\u2019 Street<\/td><td>Completed in July 2020 <\/td><td>New porphyry paving has been laid over an area of more than 2,000 m\u00b2; improvements to street lighting: 20 cast-iron lampposts have been installed, each fitted with modern LED lighting with adjustable colour temperature;<\/td><td>&nbsp;<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Forr\u00e1s: PVF Zrt. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Municipality of P\u00e9cs regards the expansion and development of the city\u2019s transport options as a key priority. During the&#8230;<\/p>\n","protected":false},"author":13,"featured_media":9446,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1774,1631,1639],"tags":[],"usertype":[52],"class_list":["post-91281","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-city-life","category-developing-pecs","category-traffic-development","usertype-local","post-variant","post-variant--saffron"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-11-13 16:30:51","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/posts\/91281","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/comments?post=91281"}],"version-history":[{"count":1,"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/posts\/91281\/revisions"}],"predecessor-version":[{"id":91290,"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/posts\/91281\/revisions\/91290"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/media\/9446"}],"wp:attachment":[{"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/media?parent=91281"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/categories?post=91281"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/tags?post=91281"},{"taxonomy":"usertype","embeddable":true,"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/usertype?post=91281"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}