{"id":91343,"date":"2021-09-23T11:47:02","date_gmt":"2021-09-23T09:47:02","guid":{"rendered":"https:\/\/pecs.hu\/koznevelesi-intezmenyek-fejlesztese\/"},"modified":"2026-10-27T10:29:20","modified_gmt":"2026-10-27T09:29:20","slug":"koznevelesi-intezmenyek-fejlesztese","status":"publish","type":"post","link":"https:\/\/pecs.hu\/en\/koznevelesi-intezmenyek-fejlesztese\/","title":{"rendered":"Development of Educational Institutions in P\u00e9cs"},"content":{"rendered":"<section id=\"carousel-gallery-block_f00c847060f873810ab8c5a15f590647\"class=\"block block-carousel-gallery alignwide\" >\n  \n      <div class=\"tinymce mb-40px\">\n      <div>\n<p>In line with Hungary\u2019s aspirations for a sustainable and carbon-neutral future, the city of P\u00e9cs is setting an example by ensuring energy security, relying on its own resources, integrating decentralised systems and applying best practice. Through the sensible utilisation of locally available resources, it is implementing local and regional measures to optimise energy consumption in properties, equipment and transport used by residents, local authorities and businesses, and is committed to modernisation measures aimed at reducing energy consumption and the associated emissions of harmful substances.<\/p>\n<p>One of the key objectives of the Local Government of the City of P\u00e9cs is to develop and carry out energy efficiency upgrades on the properties it owns, primarily public institutions. To achieve this objective, the city has submitted numerous applications in recent years in response to the call for proposals entitled \u2018TOP-6.5.1 Energy modernisation of local authority buildings\u2019, which were aimed at the energy-efficiency refurbishment of nurseries, cr\u00e8ches and primary schools. Furthermore, under the \u2018TOP-6.2.1 Development of family-friendly institutions and public services to support employment\u2019 call for proposals, the local authority also had the opportunity to carry out projects that included energy-related improvements.<\/p>\n<p>Indicators relating to the upgraded nurseries and cr\u00e8ches:<\/p>\n<\/div>\n<table style=\"width: 99.1431%; height: 1949px;\" width=\"609\">\n<tbody>\n<tr style=\"height: 65px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 65px;\" width=\"82\"><strong>Code of project<\/strong><\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 65px;\" width=\"156\"><strong>Name of project<\/strong><\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 65px;\" width=\"150\"><strong>Status of project<\/strong><\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 65px;\" width=\"119\"><strong>Number of places created (people)<\/strong><\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 65px;\" width=\"102\"><strong>Annual reduction in greenhouse gas emissions (tonnes of CO\u2082 equivalent)<\/strong><\/td>\n<\/tr>\n<tr style=\"height: 134px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 134px;\" width=\"82\">TOP-6.2.1-15-PC1-2016-00001<\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 134px;\" width=\"156\">Renovation of the Kertv\u00e1rosi Nursery School\u2019s Main Nursery (Testv\u00e9rv\u00e1rosok Square) and the Kiskuck\u00f3 Cr\u00e8che<\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 134px;\" width=\"150\">The project was physically completed in July 2018.<\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 134px;\" width=\"119\">216<\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 134px;\" width=\"102\">43,08<\/td>\n<\/tr>\n<tr style=\"height: 134px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 134px;\" width=\"82\">TOP-6.2.1-15-PC1-2016-00002<\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 134px;\" width=\"156\">Renovation of the Sikl\u00f3si \u00dati branch of the Kertv\u00e1rosi Nursery School and the relocation of the T\u00f6rpike Cr\u00e8che<\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 134px;\" width=\"150\">The project was physically completed in October 2017.<\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 134px;\" width=\"119\">183<\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 134px;\" width=\"102\">48,34<\/td>\n<\/tr>\n<tr style=\"height: 134px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 134px;\" width=\"82\">TOP-6.2.1-15-PC1-2016-00003<\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 134px;\" width=\"156\">Renovation of the Gergely Bornemissza Street Branch of the Town Centre Nursery School and the Mandula Cr\u00e8che<\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 134px;\" width=\"150\">The project was physically completed in October 2017.<\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 134px;\" width=\"119\">127<\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 134px;\" width=\"102\">36,29<\/td>\n<\/tr>\n<tr style=\"height: 68px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 68px;\" width=\"82\">TOP-6.2.1-15-PC1-2016-00004<\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 68px;\" width=\"156\">Renovation of the \u00d3voda utca Nursery School<\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 68px;\" width=\"150\">The project was physically completed in October 2017.<\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 68px;\" width=\"119\">50<\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 68px;\" width=\"102\">7,62<\/td>\n<\/tr>\n<tr style=\"height: 134px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 134px;\" width=\"82\">TOP-6.2.1-15-PC1-2016-00005<\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 134px;\" width=\"156\">Renovation of the J\u00f3zsef Hajn\u00f3czy Street Branch of the Western District Nursery School<\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 134px;\" width=\"150\">The project was physically completed in October 2017.<\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 134px;\" width=\"119\">70<\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 134px;\" width=\"102\">22,04<\/td>\n<\/tr>\n<tr style=\"height: 101px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 101px;\" width=\"82\">TOP-6.2.1-15-PC1-2016-00006<\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 101px;\" width=\"156\">Renovation of the Vasasi Branch of the Eastern District Nursery School<\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 101px;\" width=\"150\">The project was physically completed in October 2017.<\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 101px;\" width=\"119\">74<\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 101px;\" width=\"102\">31,12<\/td>\n<\/tr>\n<tr style=\"height: 101px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 101px;\" width=\"82\">TOP-6.2.1-15-PC1-2016-00007<\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 101px;\" width=\"156\">Renovation of the Tag\u00f3voda branch of the Keleti District Nursery School<\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 101px;\" width=\"150\">The project was physically completed in May 2020.<\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 101px;\" width=\"119\">50<\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 101px;\" width=\"102\">19,25<\/td>\n<\/tr>\n<tr style=\"height: 134px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 134px;\" width=\"82\">TOP-6.2.1-15-PC1-2016-00011<\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 134px;\" width=\"156\">Renovation of the Kertv\u00e1rosi Nursery School\u2019s N\u00e9meth L\u00e1szl\u00f3 Street Branch and the Kicsik\u00e9k Cr\u00e8che.<\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 134px;\" width=\"150\">The project was physically completed in June 2019.<\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 134px;\" width=\"119\">200<\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 134px;\" width=\"102\">63,24<\/td>\n<\/tr>\n<tr style=\"height: 134px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 134px;\" width=\"82\">TOP-6.2.1-15-PC1-2016-00010<\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 134px;\" width=\"156\">Renovation of the main building of the City Centre Nursery School (5 Budai Nagy Antal Street)<\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 134px;\" width=\"150\">The project was physically completed in June 2019.<\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 134px;\" width=\"119\">150<\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 134px;\" width=\"102\">51,77<\/td>\n<\/tr>\n<tr style=\"height: 68px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 68px;\" width=\"82\">TOP-6.2.1-15-PC1-2016-00009<\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 68px;\" width=\"156\">Renovation of the Napsug\u00e1r Nursery<\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 68px;\" width=\"150\">The project was physically completed in June 2019.<\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 68px;\" width=\"119\">100<\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 68px;\" width=\"102\">68,3<\/td>\n<\/tr>\n<tr style=\"height: 68px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 68px;\" width=\"82\">TOP-6.2.1-19-PC1-2020-00002<\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 68px;\" width=\"156\">Renovation of the H\u00e9tsz\u00ednvir\u00e1g Nursery.<\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 68px;\" width=\"150\">The project was completed in March 2024.<\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 68px;\" width=\"119\">40<\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 68px;\" width=\"102\">No data available<\/td>\n<\/tr>\n<tr style=\"height: 68px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 68px;\" width=\"82\">TOP-6.5.1-16-PC1-2017-00005<\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 68px;\" width=\"156\">Energy efficiency upgrade of the Z\u00f6ldliget Nursery<\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 68px;\" width=\"150\">The project was completed in November 2023.<\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 68px;\" width=\"119\">76<\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 68px;\" width=\"102\">No data available<\/td>\n<\/tr>\n<tr style=\"height: 134px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 134px;\" width=\"82\">TOP-6.5.1-16-PC1-2017-00003<\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 134px;\" width=\"156\">Energy efficiency upgrade of the Istv\u00e1n P\u00e1kolitz Street branch of the Eastern District Nursery School<\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 134px;\" width=\"150\">the works were completed in August 2021.<\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 134px;\" width=\"119\">40<\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 134px;\" width=\"102\">No data available<\/td>\n<\/tr>\n<tr style=\"height: 101px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 101px;\" width=\"82\">TOP-6.5.1-16-PC1-2017-00004<\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 101px;\" width=\"156\">Energy efficiency upgrade of the K\u00f6zt\u00e1rsas\u00e1g T\u00e9ri branch of the City Centre Nursery School<\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 101px;\" width=\"150\">The project was physically completed in December 2020.<\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 101px;\" width=\"119\">124<\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 101px;\" width=\"102\">6,97<\/td>\n<\/tr>\n<tr style=\"height: 101px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 101px;\" width=\"82\">TOP-6.5.1-16-PC1-2018-00007<\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 101px;\" width=\"156\">Energy efficiency improvements at the Zolt\u00e1n Kod\u00e1ly Street Nursery School<\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 101px;\" width=\"150\">The project was physically completed in October 2020.<\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 101px;\" width=\"119\">95<\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 101px;\" width=\"102\">9,13<\/td>\n<\/tr>\n<tr style=\"height: 101px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 101px;\" width=\"82\">TOP-6.5.1-16-PC1-2018-00009<\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 101px;\" width=\"156\">Energy efficiency improvements at the nursery on Nagy Jen\u0151 Street<\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 101px;\" width=\"150\">The project was completed in February 2024.<\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 101px;\" width=\"119\">120<\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 101px;\" width=\"102\">No data available<\/td>\n<\/tr>\n<tr style=\"height: 134px;\">\n<td style=\"width: 29.3245%; text-align: center; height: 134px;\" width=\"82\">TOP-6.5.1-16-PC1-2018-00010<\/td>\n<td style=\"width: 13.1796%; text-align: center; height: 134px;\" width=\"156\">Energy efficiency improvements to the building housing the Ajt\u00f3si D\u00fcrer Street Nursery School and Csepered\u0151 Cr\u00e8che<\/td>\n<td style=\"width: 19.1104%; text-align: center; height: 134px;\" width=\"150\">The project was completed in October 2024.<\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 134px;\" width=\"119\">157<\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 134px;\" width=\"102\">No data available<\/td>\n<\/tr>\n<tr style=\"height: 35px;\">\n<td style=\"width: 61.6145%; text-align: center; height: 35px;\" colspan=\"3\" width=\"388\"><strong>Total<\/strong><\/td>\n<td style=\"width: 15.9802%; text-align: center; height: 35px;\" width=\"119\"><strong>1872<\/strong><\/td>\n<td style=\"width: 20.0988%; text-align: center; height: 35px;\" width=\"102\"><strong>407,15<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>Indicators relating to the schools that have been developed:<\/p>\n<table style=\"width: 98.9163%; height: 674px;\" width=\"609\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\" width=\"82\"><strong>Code of Project<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"156\"><strong>Name of project<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"150\"><strong>Status of project<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"119\"><strong>Number of pupils involved in the programme<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"102\"><strong>Annual reduction in greenhouse gas emissions (tonnes of CO\u2082 equivalent)<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"82\">TOP-6.5.1-15-PC1-2016-00001<\/td>\n<td style=\"text-align: center;\" width=\"156\">Modernisation of the \u00c1rp\u00e1d Fejedelem Grammar School and Primary School<\/td>\n<td style=\"text-align: center;\" width=\"150\">construction was completed in August 2021<\/td>\n<td style=\"text-align: center;\" width=\"119\">713<\/td>\n<td style=\"text-align: center;\" width=\"102\">29,08<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"82\">TOP-6.5.1-15-PC1-2016-00002<\/td>\n<td style=\"text-align: center;\" width=\"156\">Modernisation of the M\u00f3r J\u00f3kai Primary School<\/td>\n<td style=\"text-align: center;\" width=\"150\">The project was physically completed in the autumn of 2020.<\/td>\n<td style=\"text-align: center;\" width=\"119\">574<\/td>\n<td style=\"text-align: center;\" width=\"102\">33,24<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"82\">TOP-6.5.1-16-PC1-2017-00001<\/td>\n<td style=\"text-align: center;\" width=\"156\">Energy efficiency upgrade at B\u00e1nki Don\u00e1t Street Primary School<\/td>\n<td style=\"text-align: center;\" width=\"150\">The project was completed in September 2023.<\/td>\n<td style=\"text-align: center;\" width=\"119\">347<\/td>\n<td style=\"text-align: center;\" width=\"102\">No data available<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"82\">TOP-6.5.1-16-PC1-2018-00011<\/td>\n<td style=\"text-align: center;\" width=\"156\">Energy efficiency improvements at the Ferenc Liszt Music School<\/td>\n<td style=\"text-align: center;\" width=\"150\">The project was completed in September 2023.<\/td>\n<td style=\"text-align: center;\" width=\"119\">550<\/td>\n<td style=\"text-align: center;\" width=\"102\">No data available<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" colspan=\"3\" width=\"388\"><strong>Total<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"119\"><strong>2184<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"102\"><strong>62,32<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n\n    <\/div>\n    <div class=\"carousel-gallery carousel CarouselGallery\">\n                        <div class=\"carousel-gallery__item carousel__item\">\n    <picture><source media=\"(max-width: 767px)\" srcset=\"https:\/\/pecs.hu\/app\/uploads\/2021\/09\/nevtelen-terv-5-1.jpg\"><img decoding=\"async\" src=\"https:\/\/pecs.hu\/app\/uploads\/2021\/09\/nevtelen-terv-5-1.jpg\" alt=\"N\u00e9vtelen Terv (5)\" class=\"carousel-gallery__item carousel__item\"\/><\/picture>\n  <\/div>\n                              <div class=\"carousel-gallery__item carousel__item\">\n    <picture><source media=\"(max-width: 767px)\" srcset=\"https:\/\/pecs.hu\/app\/uploads\/2021\/09\/nevtelen-terv-8.jpg\"><img decoding=\"async\" src=\"https:\/\/pecs.hu\/app\/uploads\/2021\/09\/nevtelen-terv-8.jpg\" alt=\"N\u00e9vtelen Terv (8)\" class=\"carousel-gallery__item carousel__item\"\/><\/picture>\n  <\/div>\n                              <div class=\"carousel-gallery__item carousel__item\">\n    <picture><source media=\"(max-width: 767px)\" srcset=\"https:\/\/pecs.hu\/app\/uploads\/2021\/09\/nevtelen-terv-9-1.jpg\"><img decoding=\"async\" src=\"https:\/\/pecs.hu\/app\/uploads\/2021\/09\/nevtelen-terv-9-1.jpg\" alt=\"K\u00f6znevel\u00e9si int\u00e9zm\u00e9nyek fejleszt\u00e9se\" class=\"carousel-gallery__item carousel__item\"\/><\/picture>\n  <\/div>\n            <\/div>\n<\/section>\n\n\n\n<p>Source of content: PVF Zrt.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Source of content: PVF Zrt.<\/p>\n","protected":false},"author":13,"featured_media":7910,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1774,1631,1644],"tags":[],"usertype":[52],"class_list":["post-91343","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-city-life","category-developing-pecs","category-development-of-educational-institutions-in-pecs","usertype-local","post-variant","post-variant--saffron"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-11-13 16:30:18","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/posts\/91343","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/comments?post=91343"}],"version-history":[{"count":2,"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/posts\/91343\/revisions"}],"predecessor-version":[{"id":91358,"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/posts\/91343\/revisions\/91358"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/media\/7910"}],"wp:attachment":[{"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/media?parent=91343"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/categories?post=91343"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/tags?post=91343"},{"taxonomy":"usertype","embeddable":true,"href":"https:\/\/pecs.hu\/en\/wp-json\/wp\/v2\/usertype?post=91343"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}